Friday, 1 December 2017

Winter by the brook

coppicing by the bridge

All clear but material needs to be moved to far bank

Looking much clearer along old Sherborne brook

Sad to see demise of old dead tree

First day of winter and a sunny but cool day with the GWT coppicing along the banks of the old Sherborne brook.  Will, assisted by Emma, lead the large volunteer team which headed down to the water meadows and initially focussed operations by the Gravelpits copse stretch of the brook and later moved onto the Birch copse stretch. We soon discovered that most of the coppicing was on the bank adjacent to the Gravelpits copse although I did get a good clump by the bridge on the other side. Was expecting to operate in the brook, having donned waders, but soon discovered the brook was too deep so had to operate from the bank. This meant I had to throw all the coppiced wood across the brook to the Gravelpits side where it would be tidied up by that part of the team working there. Was happy to see a couple of Red Kites but not so pleased to see that one of the iconic dead trees of the Sherborne estate had finally fallen leaving the landscape that much poorer.

Have resisted, for a while, mentioning the short comings of DEFRA, NE,NFU {and to some extent the NT } but the issues regarding Grouse shooting, wildlife crime and countryside mismanagement remain [although grudgingly criminal activities now being acknowledged by the likes of the Moorland Association]  as references by Mark Avery's blogs peak district and wildlife crime demonstrate.

Friday, 17 November 2017

A frosty start on the river

View of some of the obstructions/overshading from a very dodgy bridge

Cleared stretch of water further downstream

Rising temperature provided 'creeping' mist

Second water course forming 'island' on the far bank

Unobstructed view now, looking back at the bridge 

Spent Friday working with the GWT on a stream close to Ablington which flows into the river Coln at Bibury {trout farm}. John led the team on a sunny, frosty morning and the work was pretty similar to that carried out Mareslaid but in a prettier stretch of countryside. On this occasion I donned some waders and spent most of the time in the water removing loose wood debris and cutting back & hinging to the bank the extensive obstructions/overshading of tree branches arching across the water course. There were some heavyweight branches which required John to break the silence with his chainsaw. Once again the solid efforts of the team made quite a difference to a significant stretch of water hopefully helping improve the environment for water voles and fish.

Wednesday, 8 November 2017

Bothy Bonanza!

Blue posts leading to mine were covered by vegetation

Zoom in to spot mine entrance

Extra wide gate granting access to 'mine/bat cave compound'

Joined Mike and Maurice on a crisp and sunny November for this season's first Bat survey, starting at the Bat Cave. There were a healthy 90 lesser horseshoes in the Bat cave, 23 in the kennels, a record breaking 98 in the Bothy and 1 in the cellar giving a total of 212. Work would be needed on 'step repair' to the mines for the December count and a renewed promise of renovation work on the cellar entrance was made i.e. Maurice and myself to refit door with suitable slot for bats access ala the very successful Bothy model.

Inevitably the Autumn, Winter and possibly another Spring 'watch' will continue to curtail my activities at Sherborne but when Mike can escape the demands of the BBC/NT management I hope to sneak in some real conservation/countryside management work.

Saturday, 4 November 2017

'Careful' coppicing

An overly cluttered stretch of Sherborne Brook

Coppicing to help water flow & introduce more light
Spent Friday with GWT on a stretch of Sherborne brook just down from the boat house and weir, Mareslaid copse. John led the volunteer team where the task was to clear lots of loose debris from the river and reduce the over shading caused by fallen trees. The challenge was to help the river flow more easily by removing the many obstacles in the river, reduce the over shading (helping plant growth & of course water voles} but leave enough shading for the fish {especially the trout}.  Apparently regulations on what can be removed and what has to stay is tricky but we did our best with John's guidance. Its been a while since Mareslaid copse has been worked on so plenty of work lay ahead for the large team.

Friday, 20 October 2017

Go Faster GWT?

Reserved parking at the co-op for a special car

Yep it really is Lewis Hamilton's 2016 Formula 1 car
Today was spent at Greystones where John was leading a team to cut back willow growth along the central ditch. The renovations {exterior at least } at Greystones are looking good but I was not prepared for the standard of car parked outside the new Bourton Co-op. Ok it was second hand but only one year old and one 'careful' previous owner who only happened to be Lewis Hamilton {number confirms it}. Wasn't sure whether the WT have decided to go for speed {for their new transport}  rather than practicality but the slicks were the tyres fitted so it was a good job today was dry & sunny!

Needed 4x4 to load willow on, Formula 1 not too practical

Impressive sculpture outside roundhouse

My first view of Greystone's roundhouse, Tom's new home? 
The team {~12}was divided into 2 which covered two stretches of the central ditch cutting across 2 fields. On the far side of the ditch,  {enclosed by a stock fence} was SSSI land and of course most of the willow stands which needed cutting was on this side of the ditch. The good news was John was able to drive 4x4 to the fence line where we could load it with the willow once it had been deposited on the non SSSI land. Again the clearance of these willow stands will be good for the water voles who use this water causeway as one of their 'highways' on the reserve. At midday, having done my bit, I passed by the Greystones roundhouse which I had made a small contribution to earlier this year. 


Friday, 8 September 2017

Autumn clearance

Top of Ragged copse, self portrait?

Wednesday was spent with Mike at Sherborne, carrying out various clearance tasks. The first was at the 'Bat cave' where the vegetation, mainly Comfrey, had completely hidden the path. An aggressive use of the brush cutter soon uncovered the path down to the mine and revealed the steps. Had to replace/secure some of the stakes supporting the steps and all was ready for a visit by the Springwatch team on thursday. We then moved onto the top section of Ragged Copse where some path and fence line shrub clearance was carried out, continuing the work started earlier in the week. Not a bad mornings work especially since at the start of morning Mike had suffered 'a battering' in a fall in the estate yard.

Hyde Mill residence, we were downstream of this

Today was spent with the GWT at Hyde mill alongside an overgrown stretch of the river Dickler. John led the volunteer team which was divided into teams one checking previous work on this stretch of river and the team I was in was removing stands of willow providing shading detrimental to the growth of sedge grass etc. an important food source for water voles. Given limited available space to dispose of the large amounts of willow it was fortunate John had a trailer to collect the brash in and the nearby Meadow farm yard provided the area to unload  the material.

Friday, 25 August 2017

Ash 'bowled' over?

One half of the split Ash trunk astride the Pleasure Grounds fence

Tractor supporting Ash to pull it back over the fence

Wednesday was spent with Mike and James in the 'bowling alley' adjacent to the Pleasure grounds Sherborne. Some dispute  exists as to where the 'bowling alley' name came from with the Americans { second world war} making their claim and a document from the 19t century seemingly referencing it also. Anyway a part of an ash tree had split apart in this area and needed prompt attention before either the fence or cattle using the pasture were put at risk. The tractor with large trailer, 4x4 and full compliment of chain, pole, silky and other saws were all needed to carry out the task. Access was via ewe pen and several gates so not an easy journey. With some careful, skilful  chain and pole saw use combined with the tractor the split trunk{s} of the ash was safely brought to ground with no damage to the fence or us! All the brash was tidily piled up on the Pleasure grounds side of the fence and the wood blocked up and placed in the trailer. A full mornings work and hopefully the farmer appreciative of the work done.

Toby first to respond, for a change

No news on Barn owl boxes at Greystones today so took the 'boys' to Leckhampton Hill.